Sunday 28 June 2009

Lakeside

When we got to site yesterday, the house at filled up with water from all the rain we'd had over night, there was over an inch on the slab.



The garage slab also had a good sized puddle which needed clearing before we could stand the garage frame. Darran made a good sweep and you'll see I managed to get a bow wave at one point!



We stood the garage frame and the beams across the tops of the doors in our noisy time yesterday, the council has restricted construction time on site to between 8am and 1pm on a Saturday.








We then measured the outside of the house for the plywood which we're cutting today and will fit tomorrow.