Sunday, 20 September 2009
All Wrapped Up
Sunday, 23 August 2009
More Walls
Wednesday, 12 August 2009
Finished! Phew!
Thursday, 6 August 2009
Roofing (with Mother In Law!)
Wednesday, 5 August 2009
All Trussed Up
It's been a slow start but there is a system going now so it should start to flow. Darran is still hopeful to have it done by Sunday; tomorrow is judgement day on whether he will or not. Mum is helping tomorrow and we're painting the rafter feet and some ply wood to go around the bottom.
Monday, 3 August 2009
Raising the Roof
This morning Darran went up to the plot to start to stand the roof trusses. I spoke to him at lunch time and it was all going well and the trusses were coming in batches which made them easier to manage. Unfortunately the van driver was a bit of a wimp and although the manufacturers had told us they could get the van up there, the van driver decided he couldn't. So, this meant Darran had to carry them up to the plot (with the help of a chap who was working on the house at the front). Sunday, 26 July 2009
Quick Update
Darran will be standing the roof trusses week commencing 3rd August and I will be going up to join him on the Thursday of that week to give moral support for the final few days.
We also need to get our thinking caps on for a house name so we can register the address properly. Any suggestions gratefully received as we're struggling a bit!
Friday, 3 July 2009
Timber Frame. Done.
We have finished the timber frame, including some internal bracing walls. We have done what we wanted to in the time we had, and here I am drinking tea in the middle of the afternoon too!
Yesterday was unbearably hot, but we managed to get the Thunderbolts (bolts that tie the frame to the block work) into the base plate on the external walls and managed to do some internal walls before we just couldn't do anymore because of the heat.
Today it has been much cooler and we managed to finish the internal walls and Thunderbolt the internal walls and garage.

This is the sitting room wall dividing the sitting room from the hall and bedrooms.

Above is the start of the walls dividing the bedrooms.
We have certainly had highs and lows over the last two weeks, and there were times when we didn't think we'd make it. But we did. And we're very proud of ourselves, and very tired! Home tomorrow and then back to 'proper' work on Monday.
Wednesday, 1 July 2009
Beaming Marvelous!



The posts and beams outside the dining room window were a bit tricky (well, that's what I can publish, I'm probably not allowed to say out loud what we really thought of them!) They took so much time to set out and level and then the bolts had moved in setting over night which meant the supports wouldn't sit straight down over them, then there was a bit of banging with a hammer involved, then a bit of angle grinding, and then they fitted. Hooray!
It has been so HOT today. The hottest yet I think. How we kept going I don't know, but all big jobs are now done and we've got a few odds and ends to tie up tomorrow before doing the internal walls.
We're now aiming for Friday afternoon off.
Tuesday, 30 June 2009
Time Plys When You're Having Fun!





Sunday, 28 June 2009
Lakeside

The garage slab also had a good sized puddle which needed clearing before we could stand the garage frame. Darran made a good sweep and you'll see I managed to get a bow wave at one point!

We stood the garage frame and the beams across the tops of the doors in our noisy time yesterday, the council has restricted construction time on site to between 8am and 1pm on a Saturday.


We then measured the outside of the house for the plywood which we're cutting today and will fit tomorrow.
Friday, 26 June 2009
Hitting A (not-brick-but-timber) Wall
- Our block work around the garage was wrong.
- Katie can't read a tape measure (well, not consistently anyway).
- When it rains hard, the slab fills up with water to create our own indoor swimming pool in the sitting room (this is normal though, there is nothing wrong with the slab).
- Hardcore is really really really hard to dig a hole in.
- The cat over the wall is attracted to the sound of Darran's nail gun firing.
So not such a productive day really.
It didn't start that well as by 8am we found that the block work around the garage that the frame sits on ranged between 30mm and 50mm too narrow. We called the architect who came down and agreed and then we had to wait all day for a solution. We managed to build the frame but just not stand it so the time wasn't wasted but it was so frustrating. The architect called back late this afternoon and said that our Contractors had only been sent a part sectional drawing of the garage showing the block in front of the metal post, and had assumed that the 125mm blocks went all around the garage and not just in front of this post. Anyway, not wishing to get into who said what to who about the blocks, our architect came up with a solution to pack out the bit of block missing under each stud with a packer. This will work and we will be compensated by the architect for his lack of scrutiny when signing off the groundworks. All the frame is now cut and ready to stand tomorrow.

So, when Darran eventually found his carpenter's mojo again after the morning frustrations, I was set the task of measuring for the noggins (the horizontal bits between each stud that keeps them straight). I had the worst tape measure in the world that was rusty and a lot of the millimeter lines weren't there, but I persevered and diligently wrote everything down, only to find when Darran cut them that some were way out. I kept taking them back having to own up to the fact they didn't fit, and it was raining and about 5 o'clock so not helped by being at the end of a long day!
The more it rained the more the slab filled up and up so we were splashing about it in by the end of the afternoon, adding to the enjoyment of cutting bits of wood in the rain!
I was also given the job of digging two holes outside the dining room patio doors down through the hardcore to find the concrete pad to set the supporting beams on. I found it, but the hole is more conical than square, but it's a good start!
On brighter notes, we have a little black and white cat who lives over the wall and seems to be attracted to us by the sound of Darran firing his nail gun. This seems really odd as you would think that sound would be quite scary for a cat. It hasn't actually come to say hello properly yet, but it won't be long. We also have a site office, already moved a few things in, fire extinguisher, site manual, safety equipment, picnic chairs, it's also really good when it rains!



Tomorrow we're back on site and can make a noise until 1pm so will stand the garage and finish the noggins and studs in the house. We will then do some measuring on the external frames to fit ply board to. We had 75 sheets delivered today, and all need to be cut to size for Monday.
No rest for the self-builder!
Thursday, 25 June 2009
The Right Wing



Wednesday, 24 June 2009
The Left Wing




The plywood for the external bracing and backing is being delivered on Friday so we should hopefully get it all cut over the weekend ready to fit on Monday, then we'll start on the internal walls next week.
Monday, 22 June 2009
A Post About A Post