It was back to work for us this weekend after a long Christmas and New Year break. We had intended not to work over Christmas as we both needed a break and to do some research and planning for the next stages. The weather also meant that for a couple of weekends we were stuck due to the snow. Saturday, 23 January 2010
Hi Ho Hi Ho It's Back To Work We Go!
It was back to work for us this weekend after a long Christmas and New Year break. We had intended not to work over Christmas as we both needed a break and to do some research and planning for the next stages. The weather also meant that for a couple of weekends we were stuck due to the snow. Friday, 26 June 2009
Hitting A (not-brick-but-timber) Wall
- Our block work around the garage was wrong.
- Katie can't read a tape measure (well, not consistently anyway).
- When it rains hard, the slab fills up with water to create our own indoor swimming pool in the sitting room (this is normal though, there is nothing wrong with the slab).
- Hardcore is really really really hard to dig a hole in.
- The cat over the wall is attracted to the sound of Darran's nail gun firing.
So not such a productive day really.
It didn't start that well as by 8am we found that the block work around the garage that the frame sits on ranged between 30mm and 50mm too narrow. We called the architect who came down and agreed and then we had to wait all day for a solution. We managed to build the frame but just not stand it so the time wasn't wasted but it was so frustrating. The architect called back late this afternoon and said that our Contractors had only been sent a part sectional drawing of the garage showing the block in front of the metal post, and had assumed that the 125mm blocks went all around the garage and not just in front of this post. Anyway, not wishing to get into who said what to who about the blocks, our architect came up with a solution to pack out the bit of block missing under each stud with a packer. This will work and we will be compensated by the architect for his lack of scrutiny when signing off the groundworks. All the frame is now cut and ready to stand tomorrow.

So, when Darran eventually found his carpenter's mojo again after the morning frustrations, I was set the task of measuring for the noggins (the horizontal bits between each stud that keeps them straight). I had the worst tape measure in the world that was rusty and a lot of the millimeter lines weren't there, but I persevered and diligently wrote everything down, only to find when Darran cut them that some were way out. I kept taking them back having to own up to the fact they didn't fit, and it was raining and about 5 o'clock so not helped by being at the end of a long day!
The more it rained the more the slab filled up and up so we were splashing about it in by the end of the afternoon, adding to the enjoyment of cutting bits of wood in the rain!
I was also given the job of digging two holes outside the dining room patio doors down through the hardcore to find the concrete pad to set the supporting beams on. I found it, but the hole is more conical than square, but it's a good start!
On brighter notes, we have a little black and white cat who lives over the wall and seems to be attracted to us by the sound of Darran firing his nail gun. This seems really odd as you would think that sound would be quite scary for a cat. It hasn't actually come to say hello properly yet, but it won't be long. We also have a site office, already moved a few things in, fire extinguisher, site manual, safety equipment, picnic chairs, it's also really good when it rains!



Tomorrow we're back on site and can make a noise until 1pm so will stand the garage and finish the noggins and studs in the house. We will then do some measuring on the external frames to fit ply board to. We had 75 sheets delivered today, and all need to be cut to size for Monday.
No rest for the self-builder!
Thursday, 25 June 2009
The Right Wing



Monday, 22 June 2009
A Post About A Post


Thursday, 11 June 2009
Stud Alert!

They were really tricky to fit as the drill bits had trouble getting through the steel. To quote Head of Construction himself "they were a pain in the a*rse".
Friday, 5 June 2009
Buildstore Said Yes!
We finally got the OK from Buildstore yesterday morning that the letter the Council has eventually produced would be good enough for our Stage 1 drawdown. This is just as well as we have to pay our foundation contractors half the overall contract value in two weeks.We’re in the money! Well, strictly speaking, we’re in the money for about two weeks!
We have had such a battle trying to get the right documentation together. Buildstore will only accept either full Building Regulations approval, a Building Warrant or a Notice to Commence Works. We’re currently going through building regs and a Building Warrant is something that you only get in Scotland, so this left us the Notice to Commence Works option.
So our architect wrote to the Council notifying them that work will start in 48 hours. We sent this off to Buildstore together with documentation on other matters so they could see the Council were aware of our build and what was happening.
Buildstore came back to say this wasn’t acceptable as they needed something from the Council stating the work could commence on site, understandable when you think about it. Then the fun started! Our Council don’t just write letters like that, they only write if they’re not happy about something, if everything is going as it should they’re happy just to let it carry on. We tried several other ways but Buildstore were still wanting this particular wording, it could appear in any letter, but had to state that work could commence on site.
Almost at our wits end, our architect contacted the Environmental Officer at the Council who had been out to inspect trial holes and had verbally stated that work could proceed and the foundations could continue, hence effectively signing off the pre-commencement condition (why our architect didn’t do this anyway still remains a mystery). We were confident (well, one of us was!) this would fulfil what Buildstore needed. And we were right.
Two weeks later, a few sleepless nights and a few big important count-ups of our loose change just in case, we got it and Buildstore said yes!
Phew.
During a conversation with Buildstore today they explained that the lender will now instruct an inspection of all stages prior to the next stage release being draw down. This inspection literally means someone just turning up and checking the foundations are actually there, and then the frame is up etc. They don’t interfere with anything further and will not stop a release unless you’ve been naughty and there is no evidence on site that you have built what you’ve said you’ve built. This is because some self-builders were asking a dodgy architect to sign their Certification of Work forms to say stages had been completed when they hadn’t, and then running off with the money.
I’m telling you this because I think it is very sad, and something else hard working legitimate people have to endure for the sake of the plebs of this world.
We’re looking forward to shedding blood, sweat and tears for our house (only blood to go already by the way!) and having the satisfaction and the scabs to look back on.
Sunday, 31 May 2009
Foundations Update No. 2



Thursday, 21 May 2009
We Have Water (but no bones)!
A quick update to say that we now have water on site! Phew, one down!Friday, 15 May 2009
Foundations Update
Just a quick update on the foundations at the end of week one, everything seems to be progressing well.PS - the picture is taken from our actual foundation drawings.
Monday, 11 May 2009
Site Clearance - Day 1
It Is Finally Happening!
Today is the day that work starts on our plot. We're feeling a nervous excitement that this is actually happening! After such a long wait, someone is actually starting to build our house for us.Thursday, 30 April 2009
Go!
We met with our project manager and architect yesterday and have pressed the 'Go' button!We have signed a contract and appointed a contractor to carry out the foundation and groundworks. They start on the 11th May and will complete on or before 19th June.
We are so pleased to have a start date, both for starting on site, but also to have a date that we can work to. We will now be able to plan our time so much better and work out delivery schedules and lead times.
Our project manager was far more positive and we have definitely found a level. He seems genuinely enthusiastic and interested in our build and what we will be doing when his role has finished.
For now though, it's a huge sigh of relief. This may only be short lived but we're enjoying it at the moment!
Friday, 17 April 2009
Why It's Worth Having A Project Manager: Point 1
Wednesday, 15 April 2009
The Drawings Have Arrived
Now, I don't want to get too carried away, but....yesterday a big package arrived from the architect with all our foundation and ground works drawings enclosed, and they have gone out to tender for the work too. Wait, there's more, I also had an email back with the information we asked for last week. Things are looking up!