Saturday, 12 June 2010

Connection Complete!

The gas connection proved to be a bit of a saga.

On the first date arranged, the gas men arrived, met with Darran who was on site about what went where etc. and then went back to the mains connection on the roadside to get started. About an hour later, one of the chaps came back up to say that the wrong pipe has been installed from the mains supply to our plot. It wasn't permeable, meaning that if there was a gas leak, it wouldn't be detected and could build up and up and cause an explosion in severe cases. This pipe was put in by the vendors as part of the Conditions of Sale so it was their liability to put this right. Darran called them and explained the situation, to which they denied they had used the wrong pipe, luckily the Gas man was still there and Darran was able to pass the phone over - at which point he conceded!! This meant that they had to dig up the shared driveway and relay the pipe! I won't go in to how many property developers it takes to drive a digger!

A couple of weeks later this was done and we could get on to rearranging the connection.

Connection was eventually arranged for the Friday before the first May Bank Holiday. It was my turn to be Site Agent that day, and luckily they turned up fairly early to get on with it. They brought their long wheel base transit van up tot he plot (this was a mistake, quite why, you'll find out later!) and started fitting the meter box. They couldn't however complete the connection as Shropshire Council would not permit them to put traffic lights out on the road as it was a Friday before a Bank Holiday. Now, this is Wem. This is not a large town, and whilst yes, traffic lights would cause disruption as they would anywhere, but come on - we're hardly central London! So, away they went saying they would write or ring us when they were coming back.

As you will know from other posts, the access to the plot is narrow. And yes, you've guessed it, they got stuck. I said they were brave when they arrived on site with the van. That comment was brushed aside, they had apparently got into tighter properties. OK, three hours later, lets see you try and get out then!? I went down to where they were to find them both puffing fairly heavily on a cigarette with the engine turned off as that burning smell happened to be the clutch. Darran gave the advice that the guttering man had also had problems and that he had to reverse out so that's what they tried next and made it as when I went back about half an hour later, they had gone and there was no sign of any paintwork or dents in either wall.

Then one day, we came home from work, and there was traffic lights outside the entrance to the shared driveway. We had no idea they were coming. They caused a bit of disruption as it meant it was difficult for cars to get around and up to the driveway and parking area. We kept our heads down and in a few days they went, leaving us with a long awaited gas connection!

The best news came a few weeks later when a cheque arrived from the Service Provider compensating us for the fact that gas wasn't available on the date they specified. Good.

Saturday, 14 November 2009

Close That Window And Shut That Door!

The windows and doors arrived yesterday and are all installed and sealed. They are absolutely perfect, we are so pleased with them. I am especially pleased with the front door. I love heavy, chunky front doors and ours is definitely that.






They have one coat of stain on them already as protection, but will need about another 3 coats to make them properly weather proof.

The house now looks like a proper house and has given our enthusiasm and motivation another boost. It actually now looks like something you can live in!

An update on other things; the electricity was connected on Wednesday so we now have live power on site, and we also now have guttering up which looks really nice and blends in well to the roof (hence why you can't really see it in the pictures).

The Eurobrick System is being delivered on Friday and hopefully by then we will have cleared a space to put it in!

Thursday, 21 May 2009

We Have Water (but no bones)!

A quick update to say that we now have water on site! Phew, one down!

The Historic Officer came and looked in the trenches yesterday and was happy that no remains, bones or otherwise, had been found. As the plot is in the grounds of a listed building and close to the old castle site, it is classed as a site of potential archaeological interest. I would have secretly liked them to have found something, but we're not archaeologically interesting, so I suppose that is a good thing really!

The contractors were hoping to pour the concrete for the base slab yesterday, but as the weather hasn't been that good we're not sure how far they've got.

It's all happening now!

Monday, 11 May 2009

It Is Finally Happening!

Today is the day that work starts on our plot. We're feeling a nervous excitement that this is actually happening! After such a long wait, someone is actually starting to build our house for us.

We will be going up to the plot in a few weeks time to have a look and take some photos. The work should be about half way through so there should be something to see.

Still slightly struggling with the services, it's all just wait wait wait! I was volunteered to ring the Gas board today (although I do think this is technically a construction matter = Darran!) to try and get some coherence out of someone called Farooq. Came away still with a clean page in my notebook so rang the shipper of the actual gas who could explain everything and were much more helpful. They also fit meters for free. FREE! Now there's a word we haven't heard for a very long time.

So, that's about all for now. All seems to be going smoothly and as planned, but as with any self build, watch this space!

PS - If you've some across this site by chance and are also a self-builder and own the The Housebuilders Bible, multiply the cost they give you for service installation by four, that will be far more realistic!

Saturday, 25 April 2009

Perspiration And Percolation

We went up to the plot again today to install a builders standpipe and tap fitment on the end of our water pipe. Darran did this with apparent ease, although we did have water on site today in the form of perspiration (and rain at times)! The trench for the water pipe had to be 750mm deep which once you got through the top 4 inches or so was easy (or looked easy, I was only the one holding the tape at the required length to measure the depth of the trench and giving encouragement!).





And then it rained.

We (Darran!) then had to dig two holes to carry out percolation testing. The results will tell us how good the drainage capability is of the ground and will determine whether we can just have a soak away or will have to discharge rain water etc. in to the mains drainage system. Mum and Dad have kindly agreed to fill our holes with water and stand and watch how may seconds it takes the water to drain away!


Our tenders are due back on Monday for the foundations and ground works. We will hopefully be able to meet with the architect and project manager next week to decide on the preferred contractor and make the instruction for work to commence.

Wednesday, 22 April 2009

More Fun With Water

Darran had a telephone call from the water board yesterday advising they were going out to inspect the pipe ready for the connection. He then had a call back about an hour later saying that we needed to install a standpipe on the end of it and they couldn't make a connection until one was in place.

We could just have been particularly thick, but we didn't realise this! No where on any of the literature we had received from the water board did it state we needed a standpipe, only that a pipe needed to be there, which it is!

So, back up on Saturday to install a standpipe, complete with tap.

Sunday, 19 April 2009

Keep Out!


On Saturday we collected some site security fencing and put it up along the open boundary to the plot, after asking the people we bought the plot from to clear their rubbish, cement mixer, sand and some polystyrene off. Cheeky! They were all ready to have another bonfire as well so were a bit miffed I think!

Collecting the fence put the pick-up to work for the first time and it was perfect. It fitted up the access way without any problems. Getting out was a little more tricky, but I'm sure when Darran's had a bit more practice it will be a piece of cake!

In other news, it would appear that the project manager hasn't sent the foundation tender documents to the two people we requested so Darran needs to ring again tomorrow. The water board will also be getting a call as we think they have quoted a connection to the wrong property, and also asked us to install a connection pipe when there is one already in the ground.

It was nice to be actually doing something on our plot, even if it was only putting up fence panels!

Wednesday, 1 April 2009

Still Waiting....

We're still waiting for a response to the letter we hand delivered on Sunday (as noted in Stand Well Back).

We both hoped that we would have had an acknowledgement by now, if not a full response, given the nature of the letter and its contents.

Another week slips by; not got a good feeling about this.....

On a more positive note, all application forms have been filled in and sent back for water, electricity and gas connections. Only BT to go, although that isn't quite so urgent.

We have also made enquiries into schemes for structural warranties, and are about to register the plot with Zurich 10 Self Build Warranty. This needs to be done prior to work starting on site (which shouldn't cause a problem at the moment!). Thinking about work starting on site, that reminds me, we haven't received confirmation of Land Registry yet so I ought to phone the solicitor to find out how long that should take.

Seems like we're just waiting at the moment, then.

Tuesday, 10 March 2009

Water, Water Everywhere......

You will have heard the term 'getting blood from a stone', well today's version is 'getting water from the water board'. Who would have thought it would be so difficult? Or perhaps that is just my naivety showing and our learning curve getting steeper?!

Many minutes of explaining to a representative of the New Connections Team that I would like to arrange for a new connection, and I hadn't selected the wrong option, I really do want a water connection, I have an application form! Result!

There is still gas, electricity and eventually telephone to go.....

Onwards and upwards! Resilience and perseverance are key characteristics of the self-builder!