Sunday, 13 June 2010

Sock-et To 'Em!

When the weather has been bad and we can't do any bricking, we have been doing the electrics. We have installed the mains socket ring to the bedroom 3, the study and hallway, the lounge and the main bedroom. This has taken less time than we imagined and Darran has learned a fairly broad range of contortionists skills from scrabbling about in the roof space! That is where he was a few weekends ago when it was really hot!

We're currently doing the lighting circuit, starting in the sitting room. It's going really well. I have the important job of watching the reel of wire as it unrolls to make sure it doesn't all slip off the end and become tangled. Every little helps.

So, all the little bits are coming together.

Saturday, 12 June 2010

Connection Complete!

The gas connection proved to be a bit of a saga.

On the first date arranged, the gas men arrived, met with Darran who was on site about what went where etc. and then went back to the mains connection on the roadside to get started. About an hour later, one of the chaps came back up to say that the wrong pipe has been installed from the mains supply to our plot. It wasn't permeable, meaning that if there was a gas leak, it wouldn't be detected and could build up and up and cause an explosion in severe cases. This pipe was put in by the vendors as part of the Conditions of Sale so it was their liability to put this right. Darran called them and explained the situation, to which they denied they had used the wrong pipe, luckily the Gas man was still there and Darran was able to pass the phone over - at which point he conceded!! This meant that they had to dig up the shared driveway and relay the pipe! I won't go in to how many property developers it takes to drive a digger!

A couple of weeks later this was done and we could get on to rearranging the connection.

Connection was eventually arranged for the Friday before the first May Bank Holiday. It was my turn to be Site Agent that day, and luckily they turned up fairly early to get on with it. They brought their long wheel base transit van up tot he plot (this was a mistake, quite why, you'll find out later!) and started fitting the meter box. They couldn't however complete the connection as Shropshire Council would not permit them to put traffic lights out on the road as it was a Friday before a Bank Holiday. Now, this is Wem. This is not a large town, and whilst yes, traffic lights would cause disruption as they would anywhere, but come on - we're hardly central London! So, away they went saying they would write or ring us when they were coming back.

As you will know from other posts, the access to the plot is narrow. And yes, you've guessed it, they got stuck. I said they were brave when they arrived on site with the van. That comment was brushed aside, they had apparently got into tighter properties. OK, three hours later, lets see you try and get out then!? I went down to where they were to find them both puffing fairly heavily on a cigarette with the engine turned off as that burning smell happened to be the clutch. Darran gave the advice that the guttering man had also had problems and that he had to reverse out so that's what they tried next and made it as when I went back about half an hour later, they had gone and there was no sign of any paintwork or dents in either wall.

Then one day, we came home from work, and there was traffic lights outside the entrance to the shared driveway. We had no idea they were coming. They caused a bit of disruption as it meant it was difficult for cars to get around and up to the driveway and parking area. We kept our heads down and in a few days they went, leaving us with a long awaited gas connection!

The best news came a few weeks later when a cheque arrived from the Service Provider compensating us for the fact that gas wasn't available on the date they specified. Good.

Sunday, 11 April 2010

Catching Up

It's been a while since we updated the blog and a lot has happened. We have now moved into Halfway House and have settled in. It only took a week to unpack the boxes and put our things out around us. We haven’t unpacked everything as a) I don’t think there would be room and b) with moving again in a (hopefully fairly) short space of time we didn’t see the point, so a lot is still packed and in boxes in the spare room. We can see The Garden House from the back windows so it keeps us motivated!

Darran has been off the last couple of weeks and has made great progress. The plumbing is now completed (just the shower valves to fit) and he has also fitted the manifold to the under floor heating pipes so we no longer have spaghetti to contend with. We have tested the hot and cold water pipes and no leaks!




We now have the raised vegetable beds in, filled and planted.



The main objective continues to be the bricking. Hopefully as we’re now moving into the nicer weather we will be able to get on with it in the evenings. Darran has done some over the last couple of days as the weather has been so nice. He has done the back of the garage and around under the breezeway, ready to point.



Sunday, 7 March 2010

On The Plinth

Yesterday we stuck the blue bricks on top of the plinth around the garage.



That was followed by a trip into town on the hunt for an oven for Halfway House as it doesn't have one. We were unsuccessful with the oven, but did get three soil pipes, a sack truck and the three toilets we wanted as they were on a half price offer and we were also given a further 10% off!

Wednesday, 3 March 2010

New (temporary) Home!

I picked up the keys to Halfway House today. Hooray! One step closer to where we're going to be - just got to jump the wall and we'll be home!

(This is the view from our plot into the garden of Halfway House)

We move in the weekend of the 20th/21st March after some cleaning of the kitchen and bathroom. Apparently professional cleaners leave crumbs in kitchen drawers - and if we make a note of it on our inventory, we can leave crumbs when we leave too. I kid you not.

Slightly disappointed that we're going to have to clean (or maybe my standards are too high?) but other than that it's fine. It will make such a difference to a lot of things when we're just round the corner.

Monday, 1 March 2010

Still Soldering On

It's a month to the day since we last did an update. This hasn't been because we have been slacking off, it's just that what we've been doing has been pretty much the same for the last month - plumbing!

The hot and cold water loops are complete on the bedroom wing which is the most complex as it has the bathroom and ensuite. Now over to the living area and kitchen and cloakroom, and then across to the utility room. It has all gone really well and Darran has done a great job considering he hasn't ever done this kind of thing before.

The soldering of the joints has gone to plan. The real proof will be in the pressure test. No fires with the blow torch either, not even small ones (other than a slight charring of the flux brush)!





In other news, we now have electricity in the house which is a big tick. We have an isolator switch in the garage which is connected to the meter and have laid armoured cable (or ****** armoured cable as it was known pretty soon after we realised how difficult it is to do anything with) across the breezeway and into the lobby area to a consumer unit. We can now get on with the electrics when the plumbing has been completed.

Monday, 1 February 2010

Plumbing And A Halfway House

Too cold for bricking, this weekend saw a big leap ahead with the plumbing. The hot water loop is complete and the cold water loop is almost there.

These pipes are currently cut to size, bent to the correct angle and set in place ready to be clipped to the joists and the joints to be soldered.


After weeks of debate about copper v plastic pipe work (and yes, we mean weeks and weeks), copper was decided. It's going well so far, Darran's 'pipe-benders-face' is now easily recognisable, I think the 22mm pipe is harder to bend than first thought.

In other news, we have found a property to rent where the wall at the end of the little courtyard garden is the same wall that surrounds our plot. It is a perfect location. I have dropped the application form off today, so hopefully we'll be successful and be able to take the tenancy from the 1st March which will give us a few weeks to move in while we still have our Oxfordshire place. We'll be so glad to have moved and being so much closer will make such a difference.